Every Texas oil and gas operator keeps a current Form P-5, the Organization Report, and refiles it once a year. The renewal brings together the filing fee, any financial assurance your operations require, and, for each well inactive more than 12 months, a W-3C surface equipment certification and a W-3X plugging extension. All three are filed in LoneSTAR.
On this page
- Who keeps a P-5
- How the annual renewal works
- Financial assurance
- Inactive wells: the 12-month line
- Form W-3C: the surface equipment certification
- Form W-3X: the plugging extension
- When the inactive-well work is not done at renewal
- Proposed: new rules for wells inactive 15 years (SB 1150)
- Frequently asked
- Official sources
Who keeps a P-5
Any organization performing operations within the Railroad Commission’s jurisdiction must maintain a current Form P-5. That includes drilling, operating or producing an oil or gas well; operating a fluid injection or oil and gas waste disposal well; hauling salt water for hire by any method other than pipeline; recovering skim oil from a salt water disposal site; and operating a pipeline, among other activities. The first P-5 has to be filed before operations begin. The Commission lists Statewide Rules 1, 14, 15, 58 and 78 as the rules that govern it.
How the annual renewal works
Statewide Rule 1 requires every organization to refile its P-5 annually on the schedule the Commission assigns, and the Commission mails notification and information before each filing date. You review the information on record, correct anything that has changed, and file the renewal with the attachments your activities require. Your inactive wells are part of the same renewal.
- Filing online only: since September 1, 2026 the Commission no longer accepts paper P-5s, W-3Cs or W-3Xs. All three are filed in LoneSTAR, which takes fee payments online and generates a print-friendly PDF of each submission.
- Filing fees: $300 for an initial P-5. The annual renewal fee depends on your activities under Statewide Rule 78 and can be up to $1,350, before the surcharges that rule also requires. There is no fee for a P-5 filed only to update officers, agents or addresses.
- Changes between renewals: if any information on your Organization Report changes, file an amended P-5 within 15 days. Only address changes may be made by letter.
- Your primary email: the Commission now sends some notices to the primary email on your P-5, including the monthly H-5 test schedule for disposal and injection wells. Without one, those notices do not reach you.
Financial assurance
Under Statewide Rule 78, most regulated activities, including operating wells and pipelines, require you to file and maintain financial assurance: a performance bond (Form P-5PB), a letter of credit (Form P-5LC), or a cash deposit by cashier’s check. If you are required to carry it, the renewal documentation for that assurance must be on file for the period your P-5 covers before the renewal can be approved.
- Option 1, for operators whose only activity is operating wells: $2 per foot of the aggregate depth of all your wells, active, inactive, injection and producing alike.
- Option 2, available to all operators, by total well count: $25,000 for no wells or 1 to 10 wells, $50,000 for 11 to 99 wells, and $250,000 for 100 wells or more.
- Cash deposits renew automatically once you submit the renewal and filing fee, with no fee to renew the deposit each year.
Inactive wells: the 12-month line
Under Statewide Rule 15, an inactive well is an unplugged well that has had no reported production, disposal, injection or other permitted activity for more than 12 months. Its operator must restore it to active operation, plug it, or obtain a plugging extension. An extension requires an approved W-3X, a current Organization Report, a good faith claim to a continuing right to operate the well, a well that otherwise complies with Commission rules, and, for a well more than 25 years old, an approved fluid level or hydraulic pressure test.
Restoring a well takes more than a token barrel. A well that has been inactive 12 months or longer, and is not a disposal or injection well, stays inactive until it reports at least 5 barrels of oil or 50 Mcf of gas each month for three consecutive months, or at least 1 barrel or 1 Mcf each month for 12 consecutive months. The rules described here apply to land wells; bay and offshore wells are handled separately.
Form W-3C: the surface equipment certification
Each plugging extension application must include an affirmation, made by an individual with personal knowledge of the well’s physical condition, of the surface work required for the well’s period of inactivity. That affirmation is the W-3C, Certification of Surface Equipment Removal for an Inactive Well. The requirements stack as inactivity grows:
- Every inactive well: electric service to the well’s production site has been physically terminated.
- Inactive at least 5 years but less than 10, where the operator does not own the surface: all piping, tanks, vessels and equipment associated with and exclusive to the well have been emptied or purged of production fluids.
- Inactive 10 years or more, where the operator does not own the surface: all surface equipment and related piping, tanks, tank batteries, pump jacks, headers, fences and firewalls removed, open pits closed, and junk and trash removed. Since December 8, 2025, the operator must also affirm it has removed all equipment associated with providing electric service to the site, except equipment owned by an electric utility.
That last requirement came from House Bill 2663, and a false affirmation now carries a penalty of up to $25,000. The Commission has said Form W-3C will be revised to match. Equipment removal does not end the operator’s other duties: a clearly visible sign must stay at the wellhead, wellhead control must be maintained, and equipment removed from an inactive well may not be stored on an active lease. A well that is part of a Commission-approved enhanced oil recovery (EOR) project can keep the equipment associated with the project, and an operator kept from compliance only by safety concerns or required site maintenance may qualify for a temporary extension with a written affirmation of the facts.
Form W-3X: the plugging extension
The W-3X, Application for an Extension of Deadline for Plugging an Inactive Well, documents which option qualifies the well for its extension. Rule 15 allows these:
- Plug or restore to active operation 10% of the inactive land wells you operated at your last P-5 renewal. Wells plugged above 10% in one cycle count toward the next.
- For a publicly traded operator, its federal asset retirement obligation filings plus a UCC-1 financing statement naming the Commission as secured creditor for the cost calculation on all inactive wells.
- A blanket bond, letter of credit or cash deposit equal to the cost calculation for plugging all your inactive wells, or $2 million, whichever is less.
- For each well: an approved abeyance of plugging report, certified by a licensed Texas professional engineer or geoscientist, with an annual fee of $100 per well.
- For each well: a statement that it is part of a Commission-approved EOR project.
- For each well not otherwise required to be tested: a successful fluid level or hydraulic pressure test, with an annual fee of $50 per well for wells under 25 years old.
- For each well: a supplemental bond, letter of credit or cash deposit equal to its cost calculation, or an escrow deposit of at least 10% of it.
The cost calculation is the Commission’s average per-foot cost of state-funded plugging in the well’s district for the preceding state fiscal year, multiplied by the well’s depth. For a well more than 25 years old that has been inactive more than 10 years, the operator must also run a fluid level test every 12 months or a hydraulic pressure test every five years and have the results approved.
When the inactive-well work is not done at renewal
If a renewal would be denied only because the inactive-well requirements are not met, Rule 15 requires the Commission to tell you within 14 days of receiving a complete renewal (fees and financial assurance included), explain why in writing, and give you 90 days from the expiration of your current P-5 to comply. If you are still out of compliance after those 90 days, the Commission mails a written notice. You then have 30 days to request a hearing, with a $4,500 hearing fee; otherwise it enters an order denying the extension and the P-5 renewal. While a timely extension application is pending, your previously approved P-5 stays in effect.
Buying wells has its own clock. An operator that acquires an inactive well has six months to restore it, plug it or obtain an extension, after which the Commission may revoke its Organization Report after notice and an opportunity for a hearing. Supplemental financial assurance does not transfer with the well, and abeyance reports and EOR statements transfer only on a change of the operator’s name, so the new operator files its own.
Proposed: new rules for wells inactive 15 years (SB 1150)
The Commission has proposed amendments to Rules 15 and 58 to carry out Senate Bill 1150 (2025). They were published in the Texas Register on October 23, 2026, with comments accepted until 5 p.m. on November 20, 2026 and a public hearing that morning. As of this guide’s update they have not been adopted, and the final version may differ. As proposed:
- A new class, the “15/25 well”: inactive at least 15 years and completed at least 25 years ago.
- A 15/25 well must be plugged unless one of four extensions is approved: the operator’s history of restoring inactive wells, financial hardship, a compliance plan that addresses the well before September 1, 2042, or an individual performance bond of at least the full cost to plug it.
- Extensions for 15/25 wells would last one year, renewing with the P-5.
- Operators transferring an inactive well would file a joint transfer application, and extensions based on restoration history or hardship would not transfer with the well.
- Inactive wells completed at least 15 years ago would need fluid level or hydraulic pressure testing.
Frequently asked
How often is the P-5 renewed?
Once a year, on the schedule the Commission assigns, for as long as you have activity on its records. The Commission mails notification before your filing date, and since September 1, 2026 the renewal is filed in LoneSTAR.
Can the P-5, W-3X and W-3C still be filed on paper?
No. The Commission stopped accepting hard copies of all three on September 1, 2026. They are filed in LoneSTAR, which takes fee payments online.
How much financial assurance does an operator need?
Under Option 2, available to all operators, it depends on total well count: $25,000 for up to 10 wells, $50,000 for 11 to 99, and $250,000 for 100 or more. Operators whose only activity is operating wells can instead use Option 1, $2 per foot of the aggregate depth of all their wells.
What changed for inactive wells in 2025?
Since December 8, 2025, an operator seeking a plugging extension for a well inactive 10 years or more must affirm it has removed all equipment that provided electric service to the site, except utility-owned equipment, and a false affirmation can bring a penalty of up to $25,000. A further proposal for wells inactive 15 years was still open for comment in November 2026.
What does the W-3C certify?
That the surface work required for an inactive well is done: electric service cut off for every inactive well; production fluids purged at 5 to 10 years; and at 10 years or more, surface equipment and electric service equipment removed. The fluid and equipment steps do not apply where the operator owns the surface.
Official sources
- P-5 summary of requirements (RRC)
- Form P-5 and instructions (RRC)
- Statewide Rules 1, 15 and 78, Chapter 3 rule text (RRC)
- Rule 15 amendments under HB 2663, effective December 8, 2025 (RRC)
- Notice: paper filing ends September 1, 2026 (RRC)
- RRC LoneSTAR
- Proposed rules, including SB 1150 (RRC)
- SB 1150 proposal for Rules 15 and 58 (RRC)
Emergent Environmental is not affiliated with the Railroad Commission of Texas. This guide is informational; the Commission’s official P-5 instructions and Statewide Rule 15 are authoritative.