Form PR

Form PR explained: the Texas monthly oil and gas production report

Two pumping units on a gravel pad under a wide sky, a flare burning behind them
1. Guide
01 of 10
2. Subject
Form PR
3. Updated
4. Reading time
7 min

RRC Form PR is the monthly production report for every Texas lease that produces crude oil, casinghead gas, gas well gas or condensate. You file one report per RRC district with each lease listed inside it, due the last working day of the month after production. Since September 1, 2026 it can only be filed electronically.

On this page
  1. What Form PR reports
  2. One report per district, leases inside it
  3. When Form PR is due
  4. Filing electronically: RRC Online, not LoneSTAR
  5. Disposition codes, and where the P-18 comes in
  6. Corrected reports
  7. Frequently asked
  8. Official sources

What Form PR reports

Form PR, the Monthly Production Report, accounts for the crude oil, casinghead gas, gas well gas and condensate each lease produces, and for where every volume went. Statewide Rule 58(b) requires it from every producer for each calendar month, and the Commission’s instructions also cite Statewide Rules 27 and 54.

  • Oil wells: file for any month there is production, whether before or after initial completion, and for any month there is stock on hand.
  • Gas wells: file from the month of the completion date shown on Form G-1.
  • Recompletions: file from the recompletion date, for oil and gas wells alike. If a recompleted lease still has stock on hand, keep reporting that stock under the old RRC identifier until it is disposed of.
  • Reclassified wells: the report is due beginning with the month of the reclassification test shown on Form G-1 or Form W-2.

Volumes are monthly totals in whole numbers, with no decimals, fractions or negative numbers. Gas is reported in MCF at a base pressure of 14.65 psi and a base temperature of 60°F, and the report covers all gas produced regardless of disposition, including test production and vented or flared gas. For gas well gas you no longer convert condensate to a gas equivalent; the Commission does that automatically.

One report per district, leases inside it

You file a separate Form PR for each RRC district you produce in. Inside each district report, fields are listed alphabetically, and under each field the leases are listed in numerical order of their RRC identifier (drilling permit number, API number, lease number or gas ID number). Each lease line carries that lease’s total production and disposition. A new lease that has not been assigned an RRC identifier yet is reported under its drilling permit or API number.

The columns have to balance. For oil and condensate, Column 5 plus Column 6 minus Column 7 must equal Column 9 for every lease. For gas, Column 10 (gross production after meter corrections) must equal Column 11. Surface-commingled oil and condensate is reported against the commingle permit number, and where a lease falls under more than one commingle permit, the per-permit volumes must add up to the lease total line.

When Form PR is due

Rule 58(b) sets the outer limit: the report for each month is filed on or before the last day of the following month. The Commission’s electronic filing deadlines page puts it as the last working day of the month following the month of production, and electronic filings must be received by 12 p.m. (noon) Central time that day. The Commission notes that electronic filings received after the deadline may not be accepted, and recommends filing early so any problem can be fixed in time.

If a transporter authorized to take liquid hydrocarbons from your lease asks for them, you are also required to send it copies of your Form PR reports, corrected reports included, until it asks you to stop.

Filing electronically: RRC Online, not LoneSTAR

Since September 1, 2026 the Commission no longer accepts paper Form PRs. The same June 2026 notice ended paper filing for the P-18, P-5, W-3C and W-3X. Unlike those forms, the PR is not filed in LoneSTAR. It is filed in the older RRC Online system, or by Electronic Data Interchange (EDI) for operators set up for it.

  • Access to RRC Online starts with a Security Administrator Designation (SAD) form, which the Commission’s notice says must be filed before you can file PRs there.
  • Each company designates at least one Delegated Administrator, who creates users, resets passwords and manages the organization’s authenticated users.
  • Questions about filing the PR electronically go to the Commission’s Production Department, at the address and phone number given in the June 2026 notice.

Disposition codes, and where the P-18 comes in

Every oil or condensate disposition volume gets an oil disposition code, and every gas disposition volume gets a gas disposition code. You can use more than one code for a lease, but not the same code twice for the same RRC identifier, and each disposition is reported by its initial use or purpose.

  • Skim oil charged back by a saltwater disposal facility: include the charged volume as oil or condensate production in Column 6, and show the same volume in Column 7 as a disposition under Code 8, skim liquid hydrocarbons as charged back on Form P-18.
  • Oil used from stock tanks to frac or treat the same lease: do not show it as a disposition until you have determined it will never be recovered, then use Code 74.
  • Oil or condensate lost or stolen, including loss from fire, leaks, spills and breaks: file Form H-8 as well if the loss is more than 5 barrels.
  • Gas flared or vented under gas Codes 10 and 11: enter the authority in the remarks field, AR (authorized by rule), AE (authorized by exception), EP (exception pending) or EX (exempt).

The Code 8 line is how the two reports connect. Under Statewide Rule 56, a disposal system that cannot trace recovered skim oil to its source allocates it back to the producing properties that sent it water, and must send each property’s operator a copy of the allocation as shown on its P-18. That operator then reports the allocated volume on Form PR as the lease’s own production, shown as skim oil or skim condensate.

Corrected reports

To correct a filed report, mark it as a corrected report and list only the leases being corrected, with full identification and all monthly figures (Columns 1 through 12) for each.

Frequently asked

When is Form PR due?

On the last working day of the month following the month of production. Electronic filings must be received by noon Central time that day, and the Commission notes that filings received after the deadline may not be accepted.

Can Form PR still be filed on paper?

No. Since September 1, 2026 the Commission no longer accepts hard-copy PRs. The report is filed in RRC Online, or by EDI, and access to RRC Online requires a Security Administrator Designation form.

Is Form PR filed in LoneSTAR?

No. The P-18, P-5, W-3C and W-3X are filed in LoneSTAR, but the Commission’s June 2026 notice states that PRs are not. They are filed in RRC Online or by EDI.

Do I file a separate Form PR for each lease?

No. You file one report for each RRC district, and every lease you operate in that district is listed inside it, grouped by field and ordered by RRC identifier.

How do I report skim oil charged back by a saltwater disposal facility?

Include the charged volume as production in Column 6, and show the same volume in Column 7 as a disposition under oil disposition Code 8, skim liquid hydrocarbons as charged back on Form P-18.

Official sources

Emergent Environmental is not affiliated with the Railroad Commission of Texas. This guide is informational; the official Form PR instructions are authoritative.

Keep reading

Let us file it for you.

You send the run tickets and gauge readings. We build each district report, check every lease against your own records, and file it on your sign-off before the deadline. Ask us for a flat monthly quote.

Contact usClose

Contact us

You hear back the same business day.

Get a quote